ContactChris Robideau Client/ReferenceMike Lomayaktewa LocationKykotsmovi, AZ |
||
Project DescriptionRed Plains provided the Hopi Indian Tribe with complete construction management services for the consolidated bridge project which involved the replacement of two failing structures. The bridges were replaced with pre-cast, pre-stressed voided concrete slabs along with newly constructed abutments and asphalt pavement. RPP prepared all required bid documents, advertised the project, held pre-bid and pre-construction meetings, and provided daily inspection and oversight throughout the length of the project. The remoteness of this project provided for many issues and Red Plains’ team had to make tough decisions in the field when specifications were not met or field conditions were not consistent with the plans. In the end the project was successfully completed on time and RPP’s construction reporting and documentation was approved by the federal approving agency during their final audit of the project. |
Services Provided |