ContactGreg Massey, PE Client/ReferenceBill Simon Location |
||
Project DescriptionThis project for the Oklahoma DOT consisted of a bridge replacement on SH-9. Red Plains Professional teamed with MKEC Engineering on the design of this project. Red Plains and MKEC provided the roadway design, bridge design, right-of-way documents, traffic control plan, erosion control plan, and a construction cost estimate. Construction contract documents, construction specifications, and utility relocation services were included in the scope of work. |
Services Provided |